皇冠管理端登3网址皇冠管理端登3网址(www.99cx.vip)实时更新发布最新最快最有效的皇冠管理端登3网址、皇冠管理端登3手机网址,包括新2登3手机网址,新2登3备用网址,皇冠登3最新网址,新2足球登3网址,新2网址大全。

Works Minister Fadillah Yusof says the maintenance of federal roads is important to keep them in good condition. – The Malaysian Insight file pic, August 20, 2022.

A SUM of RM1.08 billion has been allocated for maintenance of federal roads throughout the country this year, said Works Minister Fadillah Yusof. 

He said of this amount, RM150 million is for maintenance works in the southern zone covering Pahang, Johor and Negri Sembilan. 

“Maintenance works in Pahang involve an expenditure of RM66.08 million, followed by Johor (RM60.9 million) and Negri Sembilan (RM23.63 million). 

“These maintenance works are important to keep these roads in good condition,” he told reporters in conjunction with the FTRoadpedia South 2.0 Tour in Klang today. 

Fadillah said proposals for road upgrade works on Federal Road FT050 from Ayer Hitam to Kluang in Section 33.8 until the Kluang Stadium junction in Section 49.1 would be submitted to federal authorities next year.

,

Telegram获取群成员www.tel8.vip)是一个Telegram群组分享平台。Telegram获取群成员包括Telegram获取群成员、telegram群组索引、Telegram群组导航、新加坡telegram群组、telegram中文群组、telegram群组(其他)、Telegram 美国 群组、telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容。Telegram获取群成员为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。

,

Fadillah said the Phase 3B project, with an estimated value of RM385.13 million under the 12th Malaysia Plan, is aimed at reducing fatal accidents throughout the alignment. 

He said it is a continuation of the Phase 3A project worth RM219 million, which is under construction and expected to be completed in October 2024. 

“This location has recorded the most accidents in Malaysia due to the absence of road shoulders, medians and U-turns, with 52 accidents reported from 2020 to June 2022. 

“This road is the main toll-free route connecting Batu Pahat, Kluang and Mersing districts, and it will involve construction work on road shoulders, medians, U-turns and related works,” he added.

He also said an additional allocation of RM600,000 has been approved to upgrade streetlights along Federal Road FT050 to improve various aspects of road travel, especially towards the safety of road users. – Bernama, August 20, 2022.


转载说明:本文转载自Sunbet。 Allbet声明:该文看法仅代表作者自己,与www.allbetgame.us无关。转载请注明:Telegram获取群成员(www.tel8.vip):RM1.8 billion allocated for 2022 federal road maintenance
发布评论

分享到:

线上博彩网址(www.99cx.vip):Kenanga looks towards a super app to stay ahead
你是第一个吃螃蟹的人
发表评论

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。