Telegram好玩的botwww.tel8.vip)是一个Telegram群组分享平台。Telegram好玩的bot包括Telegram群成员导出、telegram群组索引、Telegram群组导航、新加坡telegram群组、telegram中文群组、telegram群组(其他)、Telegram 美国 群组、telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容。Telegram好玩的bot为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。

KUALA LUMPUR: HSS Engineers Bhd said a joint-venture (JV) between HSS Integrated Sdn Bhd (HSSI) and HSS Engineering Sdn Bhd (HSSE) has been appointed as the management consultancy services provider for the Mass Rapid Transit 3 (MRT3) Circle Line project valued at RM997.9 million.

HSS Engineers said the JV, between its associate company, HSSI, and its wholly-owned subsidiary, HSSE, have accepted the Letter of acceptance from MRT Lingkaran Sdn Bhd on Thursday.

The contract commenced yesterday for 11 years, it said in a filing to Bursa Malaysia.

ALSO READ: MRT Corp appoints PMC for MRT3 Circle Line project

The JV’s role is to manage the delivery of a fully designed, procured, constructed and integrated project to MRT Lingkaran.

,

Telegram获取群成员www.tel8.vip)是一个Telegram群组分享平台。Telegram获取群成员包括Telegram获取群成员、telegram群组索引、Telegram群组导航、新加坡telegram群组、telegram中文群组、telegram群组(其他)、Telegram 美国 群组、telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容。Telegram获取群成员为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。

,

"The project is expected to contribute positively to the revenue, earnings and net assets of group for financial years ending Dec 31, 2022 to Dec 31, 2033," it noted.

Meanwhile, trading in the shares of HSS Engineers resumed at 10 am today after been halted for one hour, following the aforesaid announcement.

At 12 pm, HSS Engineers’ shares rose 1.0 sen to 50 sen, with 1.43 miliion units transacted. - Bernama


转载说明:本文转载自Sunbet。 Allbet声明:该文看法仅代表作者自己,与www.allbetgame.us无关。转载请注明:Telegram好玩的bot:HSS Engineers JV to provide management consultancy services for MRT3
发布评论

分享到:

皇冠足球信用平台出租:建设银行青海省分行结算与现金管理部原总经理霍豫被开除党籍和行政开除
1 条回复
  1. 新二皇冠最新手机登录(www.hg108.vip)
    新二皇冠最新手机登录(www.hg108.vip)
    (2022-10-18 00:09:59) 1#

    和闺蜜一起看,美滋滋

发表评论

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。